Skip to content
Pruthviraj Electricals

Pruthviraj Electricals

Government Electrical Contractors

  • Home
  • About Us
  • Services
    • SUB-STATION
    • GIS SUB-STATION
    • TRANSMISSION LINES
    • SOLAR
    • ALL TYPE CABLE WORK
    • SUPPLY
    • MAINTENANCE
    • LIASONING
    • ENGINEERS AND CONTRACTOR
  • Portfolio
  • Contact Us

Author: Pruthviraj Electricals

  • Home
  • Pruthviraj Electricals

765Kv Sub- Satation Work At Akuntani, Aurangabad.

January 4, 2021January 5, 2021 Pruthviraj ElectricalsLeave a Comment on 765Kv Sub- Satation Work At Akuntani, Aurangabad.

132Kv Sub station Work At Chalisgav.

January 4, 2021January 4, 2021 Pruthviraj ElectricalsLeave a Comment on 132Kv Sub station Work At Chalisgav.

132/33Kv TSS Aravali, Ratnagiri Site Work

January 4, 2021January 4, 2021 Pruthviraj ElectricalsLeave a Comment on 132/33Kv TSS Aravali, Ratnagiri Site Work

132Kv Sub station Work At Chalisgav.

January 4, 2021January 4, 2021 Pruthviraj ElectricalsLeave a Comment on 132Kv Sub station Work At Chalisgav.

132/33Kv TSS Aravali, Ratnagiri Site Work

January 4, 2021January 4, 2021 Pruthviraj ElectricalsLeave a Comment on 132/33Kv TSS Aravali, Ratnagiri Site Work

15kwp On-grid Solar system installed at Paner, Ahmadnagarla.

January 2, 2021January 2, 2021 Pruthviraj ElectricalsLeave a Comment on 15kwp On-grid Solar system installed at Paner, Ahmadnagarla.

10Kwp On-grid Inverter Installed At Kolhapur.

January 2, 2021January 2, 2021 Pruthviraj ElectricalsLeave a Comment on 10Kwp On-grid Inverter Installed At Kolhapur.

7 kwp Solar System installed at Kurundwad, Kolhapur.

January 2, 2021January 2, 2021 Pruthviraj ElectricalsLeave a Comment on 7 kwp Solar System installed at Kurundwad, Kolhapur.

190kw On grid Solar System Installed at Hatkangle, Kolhapur

January 2, 2021January 2, 2021 Pruthviraj ElectricalsLeave a Comment on 190kw On grid Solar System Installed at Hatkangle, Kolhapur

132/33Kv TSS Sub-Station Installation At Aravali, Ratnagiri.

January 2, 2021January 2, 2021 Pruthviraj ElectricalsLeave a Comment on 132/33Kv TSS Sub-Station Installation At Aravali, Ratnagiri.

Posts navigation

Older posts
Newer posts

Recent Posts

  • MCR Building work 40mw Solar AC-DC Work Solar Power Plant Bishrampur Chhattisgarh
  • MCR Building work 40 MW Solar Power Plant Bishrampur Chhattisgarh
  • 132Kv TSS Work at Chinchwali, Kharepatan. Dist – Sindhudurg.
  • 220/11 G.I.S Work at Panvel Mumbai from Sterling & Wilson Pvt.Ltd.
  • 132Kv TSS Work at Chinchwali, Kharepatan. Dist – Sindhudurg.

Recent Comments

    Quick Links

    • Home
    • About Us
    • Services
    • Portfolio
    • Contact Us

    About Us

    Pruthivraj Electricals is leading Electrical Engineering Contractor with Concrete Experience in Installations and Maintenance of Substations, GIS Substation, Transmission Lines, Solar and all types of Cable Works.

    Recent Post

    • MCR Building work 40mw Solar AC-DC Work Solar Power Plant Bishrampur Chhattisgarh December 28, 2022
    • MCR Building work 40 MW Solar Power Plant Bishrampur Chhattisgarh December 28, 2022

    Address

    11th No Line, Beside Birnalhe Hospital
    Jaysingpur, D-Kolhapur  416-101

    +918329745457
    +919689646539
    Copyright © 2023 Pruthviraj Electricals All rights reserved. Theme: Flash by ThemeGrill. Powered by WordPress